CHECK LIST
WHAT INFORMATION TO BE SENT AND BY WHEN ?
|
REPORT SUBMISSION DEADLINES |
||||
30/07/2002 |
15/05/2003 |
15/05/2004 |
15/05/2005 |
||
|
Ø Declaration : duly signed by the project Coordinator, Contractor and the Legal Representatives Annex II/2 |
OO XX |
OO XX |
OO XX |
XX |
PART I Activity Progress Report |
Ø Description on the project progress (max. 4 p. free text), Annex II/3 |
OO XX |
OO XX |
OO XX |
XX |
Ø Table on Outcomes - planned/achieved, Annex II/4 |
OO XX |
OO XX |
OO XX |
XX |
|
Ø Mobility Table - planned/achieved, Annex II/5 |
OO XX |
OO XX |
OO XX |
XX |
|
Ø Time Table - original/actual, Annex II/6 |
OO XX |
OO XX |
XX |
|
|
PART II Budget Statement
|
PART II. a. General Budget Statement Ø Budget overview table, Annex II/7 |
OO XX (only column A) |
OO XX |
OO XX |
XX |
PART II. b. Postponed / Overlapping /Cancelled activities, Annex II/8 |
|
OO XX |
XX |
|
|
PART II. c. Analytical Budget Statement
Ø
Expenditure Tables per budget heading,
Annexes II/9-17 |
|
OO XX |
OO XX |
XX |
|
Ø Individual Grantholder Reports (with attached proofs of travel costs) |
|
OO XX |
OO XX |
XX |
|
Ø Conventions |
|
OO XX |
OO XX |
XX |
|
PART III |
Transfer Request and Declaration of Continuation, Annex II/18 |
OO XX |
XX |
|
|
EUROPEAN COMMISSION
Directorate-General for Education and Culture
ANNEX II
Progress Report
TEMPUS
Joint European Project/Networking Project
Part I: Activity Progress Report (all reports)
Part II: Budget Statement
Part II. a. : General Budget Statement (all reports)
Part II. b. : Postponed/Overlapping/Cancelled activities (2nd & 3rd reports only)
Part II. c. : Analytical Budget Statement (2nd, 3rd, Last Reports only)
Part III: Transfer Request and Declaration of Continuation (1st & 2nd reports only)
UM_JEP-16015-2001 |
(Project contract n°)
The
Progress Report is to be returned in FOUR copies by registered mail by
(date as per postmark):
For 2-year projects* |
For 3-year projects* |
ý 30/07/2002(1st report) q 15/05/2003 (2nd report) q 15/05/2004 (Last report) |
q 30/07/2002 (1st report) q 15/05/2003 (2nd report) q 15/05/2004 (3rd report) q 15/05/2005 (Last report) |
* Please indicate which report you are submitting with a “X” in the relevant box
The ORIGINAL copy (with the original signatures) and THREE copies (of which TWO with the supporting documents) |
Mr Martin Westlake |
Head of Unit, Tempus – Cooperation with the USA & Canada |
Office B7/8/49 |
Directorate-General for Education and Culture |
European Commission |
B – 1049 Brussels (Belgium) |
UM_JEP-16015-2001 |
Contract n° |
This declaration should be completed and signed by the following people:
1. the Coordinator of the Joint European/Networking Project;
2. the person who is legally authorised to represent the Coordinating Institution;
3. the Contractor of the Joint European Project/Networking Project;
4. the person who is legally authorised to represent the Contracting Institution.
We, the undersigned, certify that we have submitted all the documentation that is required of us, including the documents listed in the checklist.
Furthermore, we certify that the information given in this Progress Report is correct to the best of our knowledge.
We are aware that amendments will not be accepted after the date of submission.
Name of the Coordinating Institution: University of Zagreb |
|
Name of the Coordinator: Prof. Helena Jasna Mencer
Function: Rector Done at: Zagreb Date: July 12, 2002 Signature: ........................................................................................................................ Seal of the Coordinating Institution:
|
Name of the Legal Representative: Prof. Helena Jasna Mencer Function: Rector Done at: Zagreb Date: July 12, 2002 Signature: ........................................................................................................................ ......... |
Name of the Contracting Institution: Technische Universität Wien |
|
Name of the Contractor: Dr. Franz Reichl Function: Director of University Extension Centre Done at: Vienna Date: July 19, 2002 Signature: ........................................................................................................................ Seal of the Contracting Institution:
|
Name of the Legal Representative: Prof. Peter Skalicky Function: Rector Done at: Vienna Date: July 19, 2002 Signature: ........................................................................................................................ ......... |
1st REPORT ONLY
If you have received a letter of “Proposed Recommendations and Issues for Clarification” from the Commission subsequent to the signature and approval of your contract, we ask you to provide a response in this section to the points raised and to indicate clearly what action/s will be taken to ensure that improvements are made.
We appreciate and have thankfully accepted all suggestions and recommendations as follows:
1) Needs analysis:
It is expected that the new legislation in science and higher education will be adopted by the Croatian Parliament until the end of 2002. The corresponding texts are presently under critical considerations of wide academic community. The University of Zagreb contributes with constructive propositions on numerous points, including those on the system of quality assurance.
2) Project objective:
Partners will take into account that the introduction of the mechanisms and rules is a top-down process but that the implementation of the rules should be bottom up process, i.e. broad academic basis (teaching staff and students) will be informed, trained and involved in the project.
3) Risk and assumptions:
Partners are aware of the importance of risks prevention. Therefore, we have already started organizing discussions and meetings, disseminating paper on the topics concerning quality assurance. We will continue doing this. Lack of language skills would not be one of the risks.
4) Outcomes and activities
· Croatian partners will be testing initial version all along the project implementation.
· Students and teaching staff will be involved wherever it is appropriate (in particular in activities 1.1., 2.2., 2.3.) as well as in some kind of student evaluations, see further below 5) and 6).
· We are taking into account the possibilities to rationalize the mobility flows to get the best use of the grant. From this reason, there have been made some changes in the duration of the stays planned in the original application. Forming of different groups visiting different partners institutions has been envisaged and will be also applied in the project.
5) Dissemination:
Croatian partners will include representatives from Polytechnics. In the proposals of the new higher education act (not adopted yet) Croatian authorities have not decided, yet, upon the strictly binary system or mixed system in concerning University vs. Polytechnics studies. The suggestion about the involvement of teaching staff and students in dissemination activities will be followed.
6) Quality control:
Croatian National Council for Higher Education is an accreditation and evaluation body, by law. Per reviewers and experts will be asked to implement benchmarking as techniques. Further, the incentives will be introduced as a measure for improvement as well as some kind of "sanctions" in quality control procedures.
7) Workplan:
The time table of some project activities has been modified on the basis of your suggestions and negotiations of the Steering Committee of the project.
Please provide a short free text narrative description of the activities that have taken place in the first 4 months of the project including, if relevant, any deviations from the original plans. Please provide also an appreciation of the methodology chosen for the project management and the cooperation to date.
The project has officially started on 15 April 2002. However, Vienna University of Technology, the contractor of the project, has not received the project grant up to now. This fact has had a rather negative influence on performance of the planned project activities. It has been necessary to reschedule some project activities with the aim to perform at first such activities which do not need an immediate financing from the project grant.
One of the key activities performed within the project up to was a meeting of the representatives of all Croatian partners which was held in Zagreb on June 26, 2002. The project coordinator (Prof. Helena Jasna Mencer - University of Zagreb) as well as the sub-coordinators from Croatian universities (Prof. Vlasta Vizek-Vidoviæ, Prof. Nada Èikeš, Prof. Dubravka Bjegoviæ, Prof. Ivan Vickoviæ - University of Zagreb, Prof. Željko Dujiæ-University of Split, M.Sc. Vesna Kovaè-University of Rijeka),from the Ministry of Science and Technology (Prof. Davor Butkoviæ) and from the National Council for Higher Education (Prof. Aleksa Bjeliš) were present.
The objectives of the project as well as the goals and mission of the project were discussed, in order to be acquainted with them in detail still before the Steering Committee meeting in Vienna.
It was concluded that:
- more people from universities (students, teachers and young scientist) have to be involved in
the project activities.
- a glossary of the notions on quality assurance should be prepared before the meeting in Vienna
(enclosed).
- sub-coordinators of the special topics – objectives of the project should be nominated before the implementation of the mobility scheme.
Another important project activity was the Steering Committee meeting which was organised in Vienna on July 6, 2002. During the meeting, the project partners discussed and agreed the project budget, activity plan, timetable of project activities and approaches to project management.
The following approach to the project management has been applied in the project so far:
After being informed about the approval of this Tempus project, the Contractor in co-operation with the Co-ordinator prepared a proposal of the Revised Budget and Activity Plan for the first project year. This proposal was sent to all project partners and subsequently discussed during the first Steering Committee organised in Vienna. On the basis of the negotiations, the final version of the RBAP has been prepared. This RBAP contains specification of the tasks to be performed by the project partners as well as their preliminary schedule. This version of the RBAP will be used as a basis for the realisation of project activities during the first project year.
The strategic management decisions in the project will bee made by the Steering Committee, which consists of the representatives of all project partners. The Steering Committee will meet 4 times during the project.
The every-day project management will bee performed by the contact persons at each partner institution and by their team members. The realisation of the activities will bee permanently supervised by the Coordinator and Contractor and compared with the planned timetable.
The above mentioned methodology of project management has met all project requirements up to now.
TABLE ON PLANNED / ACHIEVED OUTCOMES
You are requested to fill one Table per objective as for your application
PROJECT OBJECTIVE (N°…) · Development and implementation of a quality assurance system at Croatian universities · Development of a Handbook on quality assurance system and quality management in higher education in Croatia.
|
INDICATORS OF PROGRESS/ACHIEVEMENT· Developed quality assurance system · Implemented quality assurance system · Official documents regarding adoption of the quality assurance system · Developed Handbook on Quality Assurance System and Quality Management in Higher Education in Croatia |
||||
PLANNED OUTCOMES (N°…)
1. Staff informed and trained in the area of quality assurance system in higher education 2. Developed and tested initial version of the quality assurance system 5. Updated technical infrastructure 6. Management of the project |
ACHIEVED OUTCOMES (for 1st reports, this information should only be provided if relevant)
|
||||
Activities TO BE carried out |
|||||
Duration (from-to) |
Participating institutions (country code+ ref. N°) |
Place of activity |
Activity to be carried out |
Changes Y*/N |
|
April 2002 – March
2003 Sept. 2002 – Jan. 2003 July
2002 – Dec. 2002 June
2002, Nov. 2002 Oct.
2002
March 2002 Nov.
2002 – April 2003 Sept.
2002 – Dec. 2002 July &
Oct. 2002, Sept.
2002 – Nov. 2002 April 2002 – April 2003
|
1-14 (HR A B D E I SF) 1, 3, 4, 5 (HR) 1-14 (HR A B D E I SF) 1, 3, 4,
5 (HR) 1-14
(HR A B D E I SF) 1-14 (HR
A B D E I SF) No:1-14 (HR A B D E I SF) 1-14 (HR A B D E I SF) 1, 3, 4,
5 (HR) 1-14 (HR A B D E I SF) 1, 3, 4,
5 (HR) |
HR, EU HR HR, EU HR HR HR HR, EU HR EU, HR HR HR, EU |
1.1. Study and analyses of existing quality assurance systems in higher education 1.2. Purchase of expert literature 1.3. Preparation of a study on quality assurance systems in higher education 2.1. Organisation of the meetingsI of the working groups 2.2. Organisation of the workshop I “European Experience with Quality Assurance System(s) in Higher Education”. 2.3. Organisation of the workshop II “Development and Implementation of Quality Assurance System(s) in Higher Education” 2.4. Development of the initial version of the quality assurance system 5.1. Selection, purchase and installation of office equipment
6.1. Co-ordination meetings
6.2. Purchase of telecommunication equipment 6.3. Overall project management and administration
|
N Y* N N Y* N Y* Y* Y* Y* N |
|
* DEVIATIONS FROM ORIGINAL APPLICATION / PREVIOUS, APPROVED PROGRESS REPORT(Please explain any deviation/s in activities indicated above during the reporting period)There have been made some slight changes in the timetable of project activities resulting from the later start of the project. On the basis of your suggestions and recommendations, as well as on the basis of the discussions made during the first Steering Committee meeting in the project, there have been made some changes in the duration of the stays planned in the original application (e.g. 10 days were shortened to 7 days, 3 days were extended to 4 days, etc). The new periods meets better the time possibilities of the project partners and contributes to an effective work program during the visits abroad. |
|||||
Please use additional sheets following this model for each of the project objective
MOBILITY TABLES
Staff
|
East-West |
West-East |
East-East (regional jep) |
West-West |
Travel within the same country |
||||||
|
|
Total no. of people |
Total no. of weeks |
Total no. of people |
Total no. of weeks |
Total no. of people |
Total no. of weeks |
Total no. of people |
Total no. of weeks |
Total no. of people |
Total no. of weeks |
|
PLANNED |
48 |
33,86 |
22 |
11,57 |
|
|
5 |
1,43 |
49 |
12,29 |
|
ACHIEVED |
|
|
|
|
|
|
|
|
|
|
|
BALANCE + / - |
|
|
|
|
|
|
|
|
|
|
Students (in Curriculum Development or Mobility JEPs only)
|
East-West |
West-East |
|||
|
|
Total no. of people |
Total no. of months |
Total no. of people |
Total no. of months |
|
PLANNED |
|
|
|
|
|
ACHIEVED |
|
|
|
|
|
BALANCE + / - |
|
|
|
|
PROJECT TiMETABLE ON PLANNED OUTCOMES AND ACTIVITIES
Please fill in the columns in the following way: the 1st column with the reference number of the Outcome to which the activity refers (see Table on Planned Outcomes). The 2nd column with the activity planned to achieve the Outcome indicated in the first; the 3rd-14th columns with a cross (X) representing each week of activity when the action will be carried out in the EU countries and with “O” when it is carried out in the partner countries. Please consider a max. of 4 weeks (XXXX or OOOO) for each column.
X=1 week in EU O=1 week in partner country
Outcome planned Ref. N |
Activities |
1° month |
2° month |
3° month |
4° month |
5° month |
6° month |
7° month |
8° month |
9° month |
10° month |
11° month |
12° month |
1 |
1.1. Study and analyses of existing quality assurance systems in higher education |
O |
O |
O |
O |
O |
OOXX |
OOXX |
OOXX |
OX |
OX |
OX |
OX |
1 |
1.2. Purchase of expert literature |
|
|
|
|
|
O |
O |
O |
O |
O |
|
|
1 |
1.3. Preparation of the study on quality assurance system(s) in higher education |
|
|
|
O |
O |
OOXX |
OOXX
|
OOXX |
OX |
|
|
|
2 |
2.1. Organisation of the meeting I of the working groups |
|
|
O |
|
|
|
|
|
|
O |
|
|
2 |
2.2. Organisation of the workshop I “European Experience with Quality Assurance System(s) in Higher Education ” |
|
|
|
|
|
|
O |
|
|
|
|
|
2 |
2.3 Organisation of the workshop II “Development and Implementation of Quality Assurance System(s) in Higher Education ” |
|
|
|
|
|
|
|
|
|
|
O |
|
Outcome planned Ref. N |
Activities |
1° month |
2° month |
3° month |
4° month |
5° month |
6° month |
7° month |
8° month |
9° month |
10° month |
11° month |
12° month |
2 |
2.4. Development of the initial version of the Quality Assurance System |
|
|
|
|
|
|
|
O |
OX |
OOXX |
OOXX |
OOXX |
5 |
5.1. Selection, purchase and installation of office equipment |
|
|
|
|
|
O |
O |
O |
O |
|
|
|
6 |
6.1. Co-ordination meetings |
|
|
|
X |
|
|
O |
|
|
|
O |
|
6 |
6.2. Purchase of telecommunication equipment |
|
|
|
|
|
O |
O |
O |
|
|
|
|
6 |
6.3. Overall project management and administration |
OX |
OX |
OX |
OX |
OX |
OX |
OX |
OX |
OX |
OX |
OX |
OX |
! ATTENTION ! : Different reporting according to deadline · 1st Progress Report: Only column A · 2nd and 3rd Progress Report: Columns A to F and Annexes II/9-17 on the following pages · Last Progress Report: Columns A, B and C and Annexes II/9-17 on the following pages |
|
|
A
Distribution of
grant awarded |
BExpenditure |
CUnspent (A-B) |
DTransfer
|
EDistribution of Annual grant awarded (next contract year) |
F Requested distribution of total Annual grant (D+E) |
I |
STAFF COSTS |
40.700 |
|
|
|
|
|
II |
EQUIPMENT |
31.900 |
|
|
|
|
|
III |
PRINTING / PUBLISHING |
2.900 |
|
|
|
|
|
IV |
OTHER COSTS |
|
|
|
|
|
|
IV.1 |
Dissemination |
200 |
|
|
|
|
|
IV.2 |
Exchange losses |
|
|
|
|
|
|
IV.3 |
Others |
2.705 |
|
|
|
|
|
V |
OVERHEADS |
4.080 |
|
|
|
|
|
VI |
TRAVEL and STAY COSTS |
|
|
|
|
|
|
VI.1 |
Staff |
81.790 |
|
|
|
|
|
VI.2 |
Students (if in the contract) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OVERALL TOTAL |
164.275 |
|
|
|
|
|
|
Exchange profits |
|
|
|
|
|
|
|
Bank interests |
|
|
|
|
|
|
|
TOTAL |
164.275 |
|
|
|
|
|
Table on cancelled activities and/or activities transferred between subsequent CONTRACTUAL years
A POSTPONED activity is an action that was foreseen in the contractual year but that for various reasons will be implemented in the subsequent contractual year.
An OVERLAPPING activity is an action that began in the contractual year, but will be completed during the subsequent contractual year.
A CANCELLED activity is an action that should have been implemented in the contractual year, but that has not been carried out in that year and will not take place at all
Please note, that activities and expenditures for the contractual period can only be postponed (including overlapping activities) with the prior approval of the Commission (cf. art. 4.3 of the Contract) and Part IV of the Progress Report.
In the table below you should:
a) give a brief description of activities transferred to the following contractual year and activities cancelled in the previous contractual year
b) tick the appropriate column in relation to each of the activities
c) give the reasons why these changes occur
d) indicate the amount to be transferred to the following contractual year
OUTCOMES/Activities |
Overlapping |
Postponed |
Cancelled |
Reasons |
amount UNSPENT1 |
Amount transferred1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
Date(s) of authorisation letter(s) from the Commission for any changes:………………………………………….Please use additional sheets if needed.
No. to be copied |
Name |
Institution |
Position |
Tasks |
Employed |
TOTAL hours |
Paid from |
Paid from other sources |
|
on support |
of person |
( +country code) |
in the Institution |
performed |
from |
till |
performed for the project |
(in EURO) |
(in EURO) |
1 2 3 4
|
|
|
|
|
|
|
|
|
|
Total No. of Conventions attached to Report: |
= ………. |
|
TOTAL STAFF COSTS |
|
|
No. to be copied on support Doc. * |
Nature |
Type and specifications |
Beneficiary Institution |
Origin of equipment |
Equipment costs (in EURO) |
Transport and installation costs (in EURO) (excl. V.A.T. & Taxes) |
Maintenance and Insurance costs (in EURO) (excl. V.A.T. & Taxes) |
V.A.T and Taxes**(in EURO) |
Paid from Tempus (in EURO) |
Paid from other sources (in EURO) |
|||
1 2 3 4 |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
TOTAL EQUIPMENT |
|
|
||||
Progressive Number to be copied on supporting Doc.* |
Type of expenditure |
Purpose |
|
Beneficiary Institution
|
(in EURO) |
(in EURO) |
1 2 3 4 |
|
|
|
|
|
|
|
|
|
TOTAL PRINTING & PUBLISHING |
|
|
Progressive Number to be copied on supporting Doc.* |
Type of expenditure |
Purpose |
Beneficiary Institution
|
Date of written authorisation by the Commission |
(in EURO) |
(in EURO) |
1 2 3
|
|
|
|
|
|
|
|
|
|
|
Total Dissemination |
|
|
Please provide us with a detailed calculation. |
Paid from Tempus |
|
|
Total Exchange Losses |
|
Progressive Number to be copied on supporting Doc. |
Type of expenditure |
Purpose |
Beneficiary institution |
Paid from Tempus (in EURO) |
Paid from other sources (in EURO) |
|||
1 2 3 4
|
|
|
|
|
|
|||
|
|
|
Total “Others” |
|
|
|||
|
|
|
|
|
|
|||
TOTAL OTHER COSTS |
|
|
|
|||||
Progressive Number to be copied on supporting Doc.* |
Type of expenditure |
Purpose |
Beneficiary institution |
Paid from Tempus (in EURO) |
Paid from other sources (in EURO) |
|
1 2 3 4 |
|
|
|
|
|
|
|
|
|
TOTAL OVERHEADS |
|
|
|
STAFF AND STUDENT MOBILITY TABLES (Annexes II/16 and II/17)
Please make sure that these tables are completed correctly.
Instructions
Column 1: indicate here a progressive number to be reported on the corresponding supporting documentation;
Column 2: indicate here the name of the grantholder;
Column 3: indicate here the reference number of the sending institution as indicated by you in the original application form;
Column 4: indicate here the country code of the sending institution;
Column 5: For staff: indicate the status of the grantholder concerned at his home institution;
For students: indicate which course the students are following at their home institution, (e.g. B.Sc., MA., PhD, etc.) and the number of years they have already studied this course;
Column 6: indicate here the reference number of the host institution as indicated by you in the original application form;
Column 7: indicate here the country code of the host institution;
Column 8: indicate here the start and end dates of the mobility flow;
Column 9: For staff: indicate here the duration of the stay abroad in WEEKS;
For students: indicate here the duration of the stay abroad in MONTHS;
Column 10: indicate here the travel costs;
Column 11: indicate here the grant given to cover the costs of stay;
Column 12: indicate here the total of travel costs plus costs of stay, which should correspond to the amount reported on the Individual Grantholder Report;
Column 13: For students: indicate here the amount of the institutional costs.
COUNTRY CODES (to complete the mobility tables)
EU |
Non-EU G-24 and other countries |
Partner countries |
|||
A B D DK E F GR I IRL L NL P S SF UK |
Austria Belgium Germany Denmark Spain France Greece Italy Ireland Luxembourg Netherlands Portugal Sweden Finland United Kingdom |
AUS CDN CH CY IS J MT N NZ TR USA |
Australia Canada Switzerland Cyprus Iceland Japan Malta Norway New Zealand Turkey United States of America |
ALB BIH 807
HRV ARM AZB BR GEO KAZ KYR MOL MNG RF TAD TME UKR UZB
|
Albania Bosnia-Herzegovina Former Yugoslav Republic of Macedonia Croatia Armenia Azerbaijan Belarus Georgia Kazakhstan Kyrgyzstan Moldova Mongolia Russian Federation Tajikistan Turkmenistan Ukraine Uzbekistan |
Progressive number to |
|
Origin |
Destination |
Amount of grant paid from Tempus |
|||||||
be copied on supporting Doc. |
Name of grantholder |
Institution |
Current occupation at home institution |
Institution |
Dates |
Duration |
Travel costs |
Cost of Stay |
TOTAL* Travel costs + Cost of Stay |
||
|
|
Ref. N°. |
Country code |
Ref. N°. |
Country code |
from-till |
in weeks |
(in EURO) |
(in EURO) |
(in EURO) |
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
(9) |
(10) |
(11) |
(12)=(10)+(11) |
1 2 3 4
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL STAFF MOBILITY |
|
|
|
|||
*Total No. of IGRs attached to Report |
= …… |
|
|
|
|
|
|
TOTAL |
|
Progressive Number to |
|
Origin |
Destination |
Amount of grant paid from Tempus |
||||||||
be copied on supporting Doc. |
Name of grantholder |
Institution |
course the students are following at their home institution, (e.g. B.Sc., MA., PhD, etc.) and number of years they have already studied this course |
Institution |
Dates |
Duration |
Travel costs |
Cost of Stay |
TOTAL* Travel costs + Cost of Stay |
Institutional Costs |
||
|
|
Ref. N°. |
Country code |
Ref. N°. |
Country code |
From-till |
In months |
(in EURO) |
(in EURO) |
(in EURO) |
(in EURO) |
|
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(8) |
(9) |
(10) |
(11) |
(12)=(10)+(11) |
(13) |
1 2 3 4
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL STUDENT MOBILITY |
|
|
|
|
|||
*Total No. of IGRs attached to Report |
= …. |
|
|
|
|
|
|
TOTAL: |
|
|
UM_JEP-16015-2001 |
Contract n° |
Please complete the following declaration:
Contracting Institution : Technische Universität Wien
Please note that in accordance with Article 2.2. of the Contract, the release of the first instalment of the next annual grant is subject to the receipt and approval by the Commission of the documents listed in Article 16 and confirmation by the Budgetary Authority that the necessary budget is available.
1. Transfer request
Please tick the relevant box.
ý As foreseen by article 4.3 of the JEP/NP contract, I hereby request that remaining funds be transferred from the current contractual year to the next contractual year
o I do not request a transfer of funds from the current contractual year to the next contractual year
2. Declaration of continuation
I certify that it is the intention of the Contractor to continue the implementation of this project towards its objective with all the other project partners during the next contractual year.
For the Contractor:
|
|
.................................................................................................... (Original signature of the person legally responsible for the Contracting Institution)
Name: Dr. Franz Reichl Function: Director of University Extension Centre Place: Vienna Date: July 23, 2002 |
|
|
|
Seal of the Contracting Institution:
Details of Bank Account
TO BE COMPLETED BY THE CONTRACTOR (in capital letters)
Name of Account-holder Institution : Technische Universität Wien, Ausseninstitut ..............................
Account N°: 09643885808 ..........................................................................................................................................................
Name and address of Bank: Bank Austria Creditanstalt AG* ..........................................................................
Rilkeplatz 8, A-1043 Wien, Austria...........................................................................
Bank Sorting Code: 11000...........................................................................................................................................................
Any other reference N°: IBAN = AT17 1100 0096 4388 5808 ......................................................................................
BIC = BKAUATWW* .......................................................................................................
* valid from August 10, 2002
|
|
Your name: Dr. Franz Reichl
Full address: Vienna University of Technology University Extension Centre Gusshausstrasse 28 A 1040 Vienna ....................... - ...................... .................................................. Country code Postal code Town |
This page of the form will be returned to you on receipt of your Progress Report. Therefore please enter your name and address in the box above. Please remember to send in this page with each of your Progress Reports.
Please tick the box corresponding to the report you are submitting:
ý 1st Progress Report
o 2nd Progress Report
o 3rd Progress Report
o Last Progress Report
For internal use only. We acknowledge receipt of your Progress Report for
|
||
|
Joint European Project/Networking Project N°. UM_JEP-16015-2001
|
|
under the Tempus Programme.
Yours sincerely,
Place, ........................................ Date, ...............................
|
1 The amounts indicated in this column should correspond to the amounts indicated in the General Budget Statement, Annex II/7 respectively under the column C “Unspent” & D “Transfer”.
* Please do not forget to include your Conventions and/or readable copies of subcontract and invoice for each subcontracted task (see Guidelines for the Use of the Grant Annexes I/6 and I/7).
* Please do not forget to include readable copies of all invoices, certificates or origin and offers for tender if applicable (see Guidelines for the Use of the Grant Annexes I/8 and I/9).
* In case of invoices issued in a currency different from EURO, please indicate on the invoices the EURO equivalent amount.
** Ineligible under Tempus
* Please do not forget to include readable copies of all invoices (see Guidelines for the Use of the Grant Annex I/9).
* Please do not forget to include readable copies of all invoices and bank statements (see Guidelines for the Use of the Grant Annexes I/9 and I/10).
* Please note that no currency exchange losses will be accepted if interest gains and exchange profits are not declared.
* If the overheads are more than 2.5% and up to 5%, please do not forget to include readable copies of all invoices (see Guidelines for the Use of the Grant Annex I/10).
* Each amount reported in this column should be the total Tempus grant as reported on the corresponding IGR.
* Please include your Individual Grantholders Reports (IGRs) together with all copies of travel tickets (see Guidelines for the Use of the Grant Annex I/14 - I/15).
* Each amount reported in this column should be the total Tempus grant as reported on the corresponding IGR.